What is the Village’s process for evaluating water tower sites?

Please refer to the Water Tower Site Consideration packet using this link for detailed information about eight sites considered for the proposed water tower.

Below is an excerpt from this document of the rationale summary chart:

Potential Water Tower Site (Ranked in Order of Feasibility) Village- Owned Land Allowed by Deed Low Physical Constraints Central Location Existing Water Main Sufficient Approx. Tower Height to HGL
B. Camp Jim B βœ… βœ… βœ… βœ… ❌ 117′
G. Green Area South of Grob βœ… ❌ βœ… βœ… βœ… 117′
E. Camargo Club ❌ βœ… βœ… βœ… βœ… 123′
F. Grob Property ❌ ❌ βœ… βœ… ❌ 115′ – 127′
H. Clippinger Field βœ… ❌ βœ… ❌ ❌ 187′ – 197′
D. Remington Rd. ❌ βœ… βœ… ❌ ❌ 247′ – 267′
A. Existing Tower Site βœ… βœ… ❌ ❌ ❌ 83′
C. Radio Range Park βœ… ❌ ❌ ❌ ❌ 95′

 